FUZZY NETWORK PROJECT PLANNING AND SCHEDULE BY THE CRITICAL PATH TECHNIQUES

Authors

  • Dr.N.Rameshan, Dr.S.Muthukumaran, Dr.D.Stephen Dinagar Author

Abstract

In this paper, we compute the total project completion time for fuzzy networking conditions where the activity duration is expressed as an octagonal fuzzy integer using the critical path strategy. The application of the octagonal fuzzy number in ambiguous situations is the main topic of this work deals with OCFNs in their modified form. To demonstrate the significant improvement of the proposed methods and methodologies, a relevant numerical example is provided.