FINDING CRITICAL PATHS IN A FUZZY PROJECT NETWORK WITH OCTAGONAL FUZZY NUMBERS

Authors

  • N. Rameshan , B.Christopher Raj, S.Muthukumaran Author

Abstract

Production-based calculations of activity duration are possible, but sometimes the results of this approach are estimations that are too general and imprecise. To get around this problem, we can use fuzzy numbers to define the activity periods. As a result, the activity durations in this paper are represented by octagonal fuzzy numbers (a, b, c, d, e, f, g, h).

A clear numerical example is provided to showcase the superiority of the proposed algorithm and method.

Downloads

Published

2024-07-18

Issue

Section

Articles

How to Cite

FINDING CRITICAL PATHS IN A FUZZY PROJECT NETWORK WITH OCTAGONAL FUZZY NUMBERS. (2024). JOURNAL OF BASIC SCIENCE AND ENGINEERING, 21(1), 1734-1741. https://yigkx.org.cn/index.php/jbse/article/view/242